No reviews found
The construction of such mega industrial park has never been done before, nowhere in the world, by nobody.
The AVIS project is a long-standing concept developed over a period of 17 years. Worldwide located AVIS team members and franchisee are pursuing a very complicated concept to combine technologies under a massive graphene-carbon dome as a high-tech centre. The equipments installed processing all qualities of rubbish into nano powder. A sustainable overall solution for the cities environments.
Up to date, almost 200 constructions have been agreed around the world.
The In 2022 the final phase of the project will be initiated by the merger and acquisition of several VIP constructors for the construction of at least 10 high-tech centres every year. In order to cover the massive finance requirement, the AVIS Group has developed a unique financial model.
INPUT MATERIAL | OUTPUT PRODUCTS | |
Municipal, toxic and industrial waste unsorted
Capacity: up to 10,000,000 tons/year Recyclable Capacity: 6,000,000 tons/year Biomass Capacity: 4,000,000 tons/year | 18,000,000 MT Nano Powder 1000MW electric power 25,000 tons/year alternative meat 5,000 tons/year fish (organic) |
Usual processing development Adapting of exiting Industrial Infrastructure (if any) for manufacture of required equipment products, Graphene research and industrial production and VORTEX Nano Powder mills 3D printing in graphene and titanium. University installation together with https://www.hanyang.ac.kr/web/...
and
production of 3different types of generators for the generation of free electricity. 3D printer valuation test department with TITOMIC and prototyping production centre including robot printer test centre. General generation of green energy technology research centre units. Adapting the exiting harbour infrastructure for the discharge of rubbish import up to 20'0000'000 metric tons.
and
Installing of 250, *15 MT-Vortex mill-units for the waste conversion into 3D Nano Powder.
and
Installing 100, 3D Printer processing units for Industrial Products. PHASE 2 5 Units 10.0 Ha ‘’State of the Art’’ high teach tropical glass greenhouse and the Installation in cooperation with a Combined Heat & Cooling Power station.
and
2500 Mt organic fish production unit
and
a zero-energy input building for packing vegetables and fish.
and
2GW electro generators technology – Hydrogen Magnetic Dynamo.
and
Start TAX Free Zone Corporate Register.
and
Start Large Shipp Register.
and
Start Bank Quantum Server Centre.
Waste Conversion Capacity: >20.000.000 metric tons (phase I plus phase II)
3D Paradise City Construction for 500.000 to 1.000.000 peoples
No reviews found