Floating Waste Recycling Facility

Write a review
  • Free shipping

Description

KEY FEATURES

The giant ship has a total length of 400 m and a 63 m beam for housing a fully waste recycling and research Industry centre. The Industrial facility has a capacity of 25,000 TEU capacity, and it is powered by HMD ring reactors and the AVIS propulsion system.

Receives up to 10,000 metric tons unsorted or sorted rubbish each day Receives municipal, industrial, and toxic waste 

Receives excavated old landfill waste, Delivers 50 MW electric power or more

Receives municipal, industrial and toxic waste Receives excavated old landfill waste Delivers 50 MW electric power or more

Delivers up to 10.000 metric tons 100% pure nano powder for the 3D printing industry each day within 3 weeks fully functional upon arrival. The vessel comes with a container based docking station and floating feeding tubes.

The container-based loading dock sends unsorted or pre-sorted waste by the tubes to the vessel for shredding and milling to nano powder. The dock is covered by a solar glass dome with negative air presser to prevent external outdoor and air pollution. The intention will be processing up to 10.000MT every day. If in case the processing vessel is not able for docking directly at the harbour, the feeding tubes will connect the loading station directly with the vessel up to 1000 meters. 

Read more

Reviews

No reviews found